The Fore River Bridge Replacement is a signature project of the Patrick-Murray Administration’s Accelerated Bridge Program. A new vertical lift bridge will carry Route 3A between Quincy and Weymouth. Construction is underway in 2013, with the design-build phases shown in this animated video with music. Additional info at http://www.massdotprojectsforeriverbridge.info/ – youmovemass on YouTube
Tags: Accelerated Bridge Project, Fore River Bridge, MA, Massachusetts, Quincy, Weymouth, youmovemass