Washington D.C. is to replace the Frederick Douglass Memorial Bridge to the tune of $441 million. AECOM is leading the design of the new bridge with Archer Western Construction and Granite Construction carrying out the project.
–Architect’s Newspaper on Vimeo
Tags: AECOM, Architect's Newspaper, D.C., District of Columbia, South Capitol Bridge, Video, Vimeo, Washington