Tomorrow’s Bridges

Posted by Content Coordinator on Friday, May 6th, 2011

TRANSPORTATION RESEARCH BOARD

Durability is a problem for today’s bridges. Bridge components break down. Soils become unstable. Bridge decks deteriorate, often unnoticed. Replacing bridges can be costly, time-consuming, and disruptive to traffic. And the cycle repeats as bridges age. Innovative methods have been developed for designing and constructing new bridges, repairing existing bridges, stabilizing bridge foundations, and nondestructively testing bridges; but they are not routinely used. Today’s innovations, however, can become tomorrow’s standards.

The second Strategic Highway Research Program (SHRP 2) is working closely with the Federal Highway Administration (FHWA) and the American Association of State Highway and Transportation Officials (AASHTO) to make today’s innovations more commonplace. Resolving obstacles to implementing innovation will mean that bridges can be created and replaced faster and be much more durable. Tomorrow, it will be standard for a bridge to have a service life of more than 100 years.

Bridge Construction

Traditional construction practices—such as erecting beams and framework, tying deck reinforcing steel, placing deck concrete, and allowing concrete to cure—are time-consuming and disruptive to traffic. Innovative design and construction solutions already exist to create new bridges and rapidly replace old bridges. These techniques make it possible to move large, prefabricated bridge elements or even major bridge systems. While total design and construction timeframes that do not affect traffic may remain significant, road closures may be limited to days or even hours using accelerated bridge construction (ABC) techniques.

Tomorrow, design concepts—such as precast abutments and piers, hybrid drilled shafts, segmental piers, complete composite steel superstructure systems, complete precast concrete superstructure systems, and space frame superstructures— will be standard. Ultra high-performance concrete (UHPC) will be used in joints. Using modern construction equipment—such as above-deck driven carrier systems, launched temporary truss bridges, wheel carriers, and self-propelled modular transporters (SPMTs)—to rapidly install bridges and bridge segments will also be standard. Standardizing these approaches will streamline the planning process. ABC Technology Test Cases 1 and 2 provide examples of how tomorrow’s standards are used today.

To help turn today’s innovations into tomorrow’s standards, SHRP 2 is developing standardized approaches for designing, constructing, and reusing complete bridge systems that address rapid renewal needs and efficiently integrate modern construction equipment.

To showcase tomorrow’s standards, SHRP 2 will conduct a field demonstration of ABC techniques in spring 2011. SHRP 2 is working in conjunction with the Iowa Department of Transportation to incorporate innovative bridge elements into a bridge located at US 6 over Keg Creek in Pottawattamie County, Iowa. While the original design for the bridge replacement would have required an estimated six-month road closure, the bridge replacement using ABC will limit road closures to two weeks. The demonstration, known as the Keg Creek Bridge Project, will showcase a prefabricated superstructure module (precast concrete deck on steel stringers), prefabricated substructure components (precast pier columns and caps and abutment stem and wing walls), and a prefabricated bridge approach (precast concrete panels and sleeper slab). This project will be the first in the United States to use UHPC to provide a full, moment-resisting transverse joint at the piers. A video of this demonstration will be posted on the SHRP 2 website.

ABC Construction Technology Test Case 1

Download full version (PDF): Tomorrow’s Bridges

About Transportation Research Board
www.trb.org
“The mission of the Transportation Research Board is to provide leadership in transportation innovation and progress through research and information exchange, conducted within a setting that is objective, interdisciplinary, and multimodal.”

Tags: , , ,

Comments are closed.

Follow InfraUSA on Twitter Facebook YouTube Flickr

CATEGORIES


Show us your infra! Show us your infra!

Video, stills and tales. Share images of the Infra in your community that demands attention. Post your ideas about national Infra issues. Go ahead. Show Us Your Infra!  Upload and instantly share your message.

Polls Polls

Is the administration moving fast enough on Infra issues? Are Americans prepared to pay more taxes for repairs? Should job creation be the guiding determination? Vote now!

Views

What do the experts think? This is where the nation's public policy organizations, trade associations and think tanks weigh in with analysis on Infra issues. Tell them what you think.  Ask questions.  Share a different view.

Blog

The Infra Blog offers cutting edge perspective on a broad spectrum of Infra topics. Frequent updates and provocative posts highlight hot button topics -- essential ingredients of a national Infra dialogue.


Dear Friends,

 

It is encouraging to finally see clear signs of federal action to support a comprehensive US infrastructure investment plan.

 

Now more than ever, our advocacy is needed to keep stakeholders informed and connected, and to hold politicians to their promises to finally fix our nation’s ailing infrastructure.

 

We have already engaged nearly 280,000 users, and hoping to add many more as interest continues to grow.

 

We require your support in order to rise to this occasion, to make the most of this opportunity. Please consider making a tax-deductible donation to InfrastructureUSA.org.

 

Steve Anderson

Managing Director

 

SteveAnderson@InfrastructureUSA.org

917-940-7125

InfrastructureUSA: Citizen Dialogue About Civil Infrastructure