Support for InfrastructureUSA.org
has been provided by these organizations and individuals:

John Hennessy III,
P.E.

Posts Tagged ‘Utah’

Salt Lake City, UT: Solar Panel Construction Time Lapse at the Natural History Museum of Utah

Wednesday, May 23rd, 2012

http://www.facebook.com/frostjeffIn December of 2011 I was commissioned to do a time lapse film of the solar panel installation at the brand new Natural History Museum of Utah in Salt Lake City by green energy company, S Power (http://www.spower.com). This film was shot during all of December; only taking one single day off, Christmas (but only […]

View this complete post...

American Fork, UT: Sam White Bridge – Accelerated Bridge Construction (ABC)

Monday, April 23rd, 2012

The video provides a time lapse of the 1.725 billion Utah County I-15 Corridor Expansion (I-15 CORE) design-build project, UDOT, with contractor Provo River Constructors, used Accelerated Bridge Construction (ABC) techniques to move the Sam White Bridge in American Fork, Utah. Baker provided design of the bridge, the SPMT move path, temporary supports and provided […]

View this complete post...

American Fork, UT: Sam White Bridge Move

Friday, March 23rd, 2012

The following video shows the I-15 CORE design-build project which used Accelerated Bridge Construction (ABC) techniques to move the Sam White Bridge in American Fork, Utah. – MichaelBakerCorp on YouTube

View this complete post...

Wastewater… Reject or Resource?

Friday, January 13th, 2012

Another classic from the CH2M HILL vault. Have you ever wondered what happens to the water you send down the drain? Learn more about what, at the time, was the world’s most advanced wastewater treatment system, The Lake Tahoe Advanced Wastewater Treatment Plant. – ch2mhillpr on YouTube

View this complete post...

Farmington, UT: Davis School District Construction Update

Friday, January 6th, 2012

Two major construction projects are well underway in the Davis School District. A new school building is beginning to take shape adjacent to Wasatch Elementary. Students will move to the new building in the fall. In Farmington, construction is ongoing at the Vista School. That project is being constructed in phases. Students are still attending […]

View this complete post...

Jordan River Water Quality Study

Wednesday, January 4th, 2012
picture-15

This water quality study for the Jordan River establishes the Total Maximum Daily Load (TMDL) for Total Organic Matter (OM) of 3,983 kg/day that will achieve the model endpoint for Dissolved Oxygen (DO). This target concentration is defined in a water quality model (QUAL2Kw) which is being used as a decision support tool for restoring beneficial use to the lower Jordan River. Additional testing was conducted to quantify uncertainty of input parameters and rates used in the calibrated model. Based on these results and additional information reviewed during the TMDL process, a 1.0 mg/L implicit Margin of Safety (MOS) was added to the Jordan River instantaneous DO standard of 4.5 mg/L. Input concentrations of Total OM that resulted in meeting the model endpoint of 5.5 mg/L DO were used to define permissible loads to the lower Jordan River. This model endpoint and the resulting permissible loads account for levels of uncertainty that exist in the TMDL process at this time and are designed to maintain DO levels in the lower Jordan River above the instantaneous DO standard.

View this complete post...

Salt Lake County, UT: Mountain View Corridor Winter 2012 Progress Update

Wednesday, January 4th, 2012

In Salt Lake County, construction of the Mountain View Corridor is about halfway complete. View the video to see just how far we’ve come. Crews are on schedule to complete initial construction of the Mountain View Corridor by the end of 2012. – UtahDOT on YouTube

View this complete post...

Logan, UT: Opening of 10 West Project

Tuesday, January 3rd, 2012

Vic Saunders from Utah Department of Transportation talks about the opening of 1000 West in Logan Utah – TheValleyChannel on YouTube

View this complete post...

Spanish Fork, Utah: I-15 CORE New Spanish Fork Interchange

Tuesday, December 6th, 2011

I-15 CORE is reconstructing the US-6 and Spanish Fork Main Street interchanges, combining them into a single interchange to improve traffic flow, accommodate future growth and enhance safety.  Uploaded by UtahDOT on Youtube.

View this complete post...

Lehi to Spanish Fork, Utah: I-15 CORE Lane Shifts

Monday, October 17th, 2011

Several lane shifts are currently in place along I-15 CORE from Lehi to Spanish Fork. These lane shifts allow crews to complete freeway reconstruction along the entire 24-mile project by December 2012. Drivers should plan ahead, stay alert, and follow all posted signs and speed limits when traveling through construction zones. In areas where lanes […]

View this complete post...

Follow InfraUSA on Twitter Facebook YouTube Flickr

CATEGORIES


Show us your infra! Show us your infra!

Video, stills and tales. Share images of the Infra in your community that demands attention. Post your ideas about national Infra issues. Go ahead. Show Us Your Infra!  Upload and instantly share your message.

Polls Polls

Is the administration moving fast enough on Infra issues? Are Americans prepared to pay more taxes for repairs? Should job creation be the guiding determination? Vote now!

Views

What do the experts think? This is where the nation's public policy organizations, trade associations and think tanks weigh in with analysis on Infra issues. Tell them what you think.  Ask questions.  Share a different view.

Blog

The Infra Blog offers cutting edge perspective on a broad spectrum of Infra topics. Frequent updates and provocative posts highlight hot button topics -- essential ingredients of a national Infra dialogue.


Dear Friends,

 

It is encouraging to finally see clear signs of federal action to support a comprehensive US infrastructure investment plan.

 

Now more than ever, our advocacy is needed to keep stakeholders informed and connected, and to hold politicians to their promises to finally fix our nation’s ailing infrastructure.

 

We have already engaged nearly 280,000 users, and hoping to add many more as interest continues to grow.

 

We require your support in order to rise to this occasion, to make the most of this opportunity. Please consider making a tax-deductible donation to InfrastructureUSA.org.

 

Steve Anderson

Managing Director

 

SteveAnderson@InfrastructureUSA.org

917-940-7125

InfrastructureUSA: Citizen Dialogue About Civil Infrastructure