To reduce DC waste by 98 percent, the 20-year D.C. Clean River Project has a 1323-ton, 442-foot tubular machine digging a 23-foot-diameter concrete water tunnel.
DC Water named its massive tunnel boring machine Lady Bird, christened it with DC tap water, and prepared to send it underground to tunnel more than four miles.
-HugBig on YouTube