The Utah Department of Transportation (UDOT) will improve Redwood Road south of Pioneer Crossing in Saratoga Springs over the next two years. The improvements, which are scheduled to begin this summer, are designed to reduce congestion and extend the life of the roadway.
–Utah Department of Transportation on YouTube
Tags: Saratoga Springs, SR-68, UDOT, UT, Utah, Utah Department of Transportation