In-the-wet dam construction has been described as building underwater with giant Lego pieces. This time-lapsed video of the dam construction phase of the Olmsted Locks and Dam project on the lower Ohio River explains the process of moving the giant monoliths from their construction beds to their final destination on the bottom of the river. – LouisvilleUSACE on YouTube
Tags: Illinoi, LouisvilleUSACE, Ohio River, Olmsted, Olmsted Dam, YouTube