Executive Summary

The Environmental Protection Agency’s proposed Clean Power Plan (CPP) establishes state-by-state carbon emissions rate targets that it projects will reduce U.S. electricity sector carbon emissions 30% below 2005 levels by 2030. Some stakeholders, including the North American Electric Reliability Corp. (NERC), have raised concerns that states might rely heavily on natural gas generation for CPP compliance, creating stress on gas pipeline capacity and ultimately affecting electric system reliability. While it is likely that states will pursue a diverse portfolio of emission reductions, examining the infrastructure implications of gas use scenarios helps with risk management.

The AEE Institute contracted with ICF International to perform an assessment of the potential impacts of the CPP on required gas pipeline capacity. AEE Institute specified three scenarios in the U.S. electricity and natural gas markets for ICF to analyze. The Reference Case is a business-as-usual future without the CPP.1 The basic CPP Case assumes each state will reach its rate-based emissions target as proposed in the CPP by 2030 with resources competing in the model to provide the necessary emission reductions.2 The Low Gas Price CPP Case considers the same emissions targets and approach as in the CPP Case, but assumes natural gas prices are approximately 20% lower than expected, leading to increased gas consumption.

No Significant Increase in Pipeline Needs under CPP, Even With Low Gas Prices

Figure 1 (next page) shows the modeling results for the net incremental gas demand contribution of the CPP and Low Gas Price CPP Cases compared to the Reference Case.3 Under the Reference Case, natural gas demand continues to grow through 2030. Under the CPP Case, there is a temporary increase in natural gas demand above the Reference Case due to the incremental shift from coal to gas. Incremental demand then declines over time as additional renewable energy and demand-side resources come online. Since this incremental demand is small, even if coal to gas switching becomes a more prominent compliance mechanism, as under the low future gas prices scenario, this modeling shows that it would not cause a significant increase in new pipeline requirements. There is, however, regional variation among these results: Changes in gas consumption and infrastructure are concentrated in the Northeast, but could be greater in the South and Midwest if gas prices are lower.

Consistent with some prior studies from EPA4 and DOE, 5 this report finds that ongoing changes in the U.S. natural gas market independent of the CPP are driving increases in pipeline gas infrastructure, prompted by dramatic growth in new gas supplies from areas like the Marcellus and Utica shales. This report further finds that compliance with the CPP, even under an unlikely “stress test” scenario of unexpectedly high gas usage, would only modestly increase the gas infrastructure needs, in the range of 3% to 7%.

Three key factors explain this outcome:

  • A large number of pipeline projects are already in the planning stages to expand capacity over the next three to five years. These planned projects are sufficient to meet both the anticipated growth in gas demand in the Reference Case (that is, demand growth not related to the CPP) as well as much of the incremental demand in the CPP cases.
  • The assumed increase in energy efficiency in the CPP cases reduces electric load growth relative to the Reference Case. Because electric load growth is lower, power sector gas demand in the Northeast and West regions is actually lower in the CPP Case in 2030 than in the Reference Case, and only slightly higher than the Reference Case in the CPP Low Gas Price Case.
  • Third, while Midwest and South power sector gas consumption is projected to increase in both CPP cases, these areas are relatively close to incremental gas supplies (principally the Marcellus and Utica shales). The proximity of the incremental gas demand to the source of the incremental supplies and the reversals of existing pipelines (moving gas from Marcellus/Utica to the Midwest and South on existing pipelines) reduces the amount of new pipeline and capital expenditures required.

Figure 1. Projected U.S. Natural Gas Demand in AEE Institute Scenarios

The pace of investment in new pipeline capacity over the past decade suggests that these projected future investments, with or without the CPP, are well within the capabilities of the industry. This conclusion is reinforced by the fact that there are numerous competitive options for emission reduction available in the marketplace that collectively reduce the risk of heavy dependence on natural gas for compliance.6 Furthermore, this analysis does not capture the evolution of certain technologies (e.g., gas demand response) and electricity grid operational techniques (e.g., ISO New England’s Pay for Performance rules), which are changing and will continue to change the relationship between gas demand and infrastructure needs.

Download full version (PDF): Impacts of the Clean Power Plan on U.S. Natural Gas Markets and Pipeline Infrastructure

About the Advanced Energy Economy Institute (AEE Institute)
www.aee.net/about/institute
The Advanced Energy Economy Institute (AEE Institute) is a 501(c)(3) charitable organization whose mission is to raise awareness of the public benefits and opportunities of advanced energy. AEE Institute provides critical data to drive the policy discussion on key issues through commissioned research and reports, data aggregation, and analytic tools. AEE Institute also provides a forum where leaders can address energy challenges and opportunities facing the United States. AEE Institute is affiliated with Advanced Energy Economy (AEE), a 501(c)(6) business association, whose purpose is to advance and promote the common business interests of its members and the advanced energy industry as a whole.

Tags: , , ,

Comments are closed.

Follow InfraUSA on Twitter Facebook YouTube Flickr

CATEGORIES


Show us your infra! Show us your infra!

Video, stills and tales. Share images of the Infra in your community that demands attention. Post your ideas about national Infra issues. Go ahead. Show Us Your Infra!  Upload and instantly share your message.

Polls Polls

Is the administration moving fast enough on Infra issues? Are Americans prepared to pay more taxes for repairs? Should job creation be the guiding determination? Vote now!

Views

What do the experts think? This is where the nation's public policy organizations, trade associations and think tanks weigh in with analysis on Infra issues. Tell them what you think.  Ask questions.  Share a different view.

Blog

The Infra Blog offers cutting edge perspective on a broad spectrum of Infra topics. Frequent updates and provocative posts highlight hot button topics -- essential ingredients of a national Infra dialogue.


Dear Friends,

 

It is encouraging to finally see clear signs of federal action to support a comprehensive US infrastructure investment plan.

 

Now more than ever, our advocacy is needed to keep stakeholders informed and connected, and to hold politicians to their promises to finally fix our nation’s ailing infrastructure.

 

We have already engaged nearly 280,000 users, and hoping to add many more as interest continues to grow.

 

We require your support in order to rise to this occasion, to make the most of this opportunity. Please consider making a tax-deductible donation to InfrastructureUSA.org.

 

Steve Anderson

Managing Director

 

SteveAnderson@InfrastructureUSA.org

917-940-7125

InfrastructureUSA: Citizen Dialogue About Civil Infrastructure