We are replacing the 87-year old two-lane bridge with a wider, four-lane bridge with sidewalks and a bike lane. We will also build retaining walls and an enclosed storm water system for roadway runoff.
The new bridge will open to traffic at 5 a.m. Monday, April 16. The bridge will completely close from 8 p.m. Friday, April 13, until 5 a.m. April 16 as crews prepare for the traffic shift. Once traffic is using the new bridge, crews will begin demolishing the old bridge.
For more information, visit the project website http://www.wsdot.wa.gov/projects/sr529/ebeysloughbridge/ – wsdot on YouTube
Tags: Ebey Slough Bridge, Marysville, SR 529, WA, WSDOT, YouTube