Using two time-lapse video cameras, ADOT captured the 9-month repair of the landslide-damaged US 89 roadway.
Watch as crews move nearly a million cubic yards of dirt and rocks from above the damaged roadway to build a buttress below, and then realign and pave a new roadway.
More information: www.azdot.gov/US89
–ArizonaDOT on YouTube
Tags: Arizona, Arizona Department of Transportation, ArizonaDOT, AZ, Page, U.S. 89, YouTube