The video provides a time lapse of the 1.725 billion Utah County I-15 Corridor Expansion (I-15 CORE) design-build project, UDOT, with contractor Provo River Constructors, used Accelerated Bridge Construction (ABC) techniques to move the Sam White Bridge in American Fork, Utah. Baker provided design of the bridge, the SPMT move path, temporary supports and provided on-site technical support and consultation during the bridge move. At 354 feet long, it is the longest two-span bridge ever moved in the Western Hemisphere and weighs 3.82 million pounds. – RBFConsulting on YouTube
Tags: ABC, Accelerated Bridge Construction, American Fork, I-15 CORE, I-15 Corridor Expansion, UDOT, UT, Utah